Offshore Oil & Gas

PROJECT - BAROSSA GAS FPSO 

Front End Engineering Design (FEED) for Complete topsides (16 modules + Piperack) across discipline engineering of the FPSO which included Process Modeling, P&IDs, Power Generation Scheme, Structural and Layout optimization and analysis based on availability of various yards, General Arrangement Drawings, MTOs, 3D Model, etc.

Client: BW Offshore, Singapore

Engineering Schedule – 4 Months

 

PROJECT - FLARE MINIMISATION

Concept Selection, Concept Design and Front End Engineering Design (FEED) for Flare Minimization Scheme at Lower Zakum Facilities ZWSC/ZCSC and Umm Shaif (USSC) Facilities

Client: ILF Consulting, UAE

Engineering Schedule – 6 Months

Project – GIMBOA FPSO, ANGOLA

FEED Verification & Detailed Engineering for complete Topsides Process facilities (18 modules) involving  (Multidisciplinary) all Discipline – Process, Safety, Structural, Mechanical, Piping, Electrical Instrumentation. Etc.  Including Procurement engineering support and Operation and Maintenance manuals.  The facilities include:

Oil Separation & Processing train ,Gas processing, Gas compression ,Produced Gas dehydration ,Flare ,Fuel Gas ,Fired heater ,Seawater lift ,Chemical injection ,Sulphate injection ,Flow line circulation ,Power generation

Client: Saipem S.A, France 

Engineering Schedule – 10 Months

Project – Cidade do Rio de Janeiro RJS 409 Espadarte Sul FPSO, Brazil

FEED Verification and Detailed Engineering (Multi-disciplinary) for Topside process facilities (22 modules)involving all disciplines, including procurement engineering supportand Operation and Maintenance manuals.The facilities include:

Oil Separation and Treatment System ,Gas Compression ,Produced Water Treatment ,Produced Water Injection System ,Sea Water Treatment ,Sea Water Injection Systems ,LP / HP Separation ,Produced Water Testing and Disposal Unit ,Waste Heat Recovery & associated heating media ,Gas ,Dehydration & Gas lift ,Flare ,Fuel Gas ,Seawater lift ,Chemical injection

Client - MODEC Intl., USA

Engineering Schedule – 12 Months

PROJECT - MV34 ENI AREA 1 FPSO

Detailed Engineering services for the Topsides involving all disciplines, procurement engineering support ed Modeling and Operation and Maintenance manuals. The facilities include Oil Separation and Treatment System, Gas Compression, Produced Water Treatment, Produced Water Injection System, Sea Water Treatment, Sea Water Injection Systems, LP / HP Separation, Produced Water Testing and Disposal Unit, Waste Heat Recovery, Gas dehydration & Gas lift, Flare, Fuel Gas, Seawater lift, Chemical injection.

Client - MODEC Inc., Singapore

Engineering Schedule – 12 Months

Project - FOROOZAN –DEVELOPMENT OPERATION & PRODUCTION ENHANCEMENT,

FEED Endorsement and Detailed Engineering coveringinvolving multidisciplinary activities – Process, Safety, Structural, Mechanical, Piping, Electrical Instrumentation Telecom etcincluding Procurement engineering support 3 D Modeling and Operation and Maintenance manualsfor:

FZ-A Processing Platform, FY-A Accommodation (70men) Platform, Bridge between FZ-A and FZ and Bridge between FZ-A and FYA (New Platforms), Engineering &Procurement services for two new sour transfer pumps, Receivers of Pipelines and the J-tube of the subsea cable from FZA to , FX on FX Platform , Topsides modification in 5 Satellite well heads

Client - Confidential

Engineering Schedule – 20 Months

Project - LIFE EXTENSION WELL HEAD PLATFORM

Pre/post engineering surveys, Detailed engineering, involving  (Multidisciplinary) all Discipline – Process, Safety, Structural, Mechanical, Piping, Electrical Instrumentation Telecom etcincluding Procurement engineering support 3 D Modeling and Operation and Maintenance manuals and As built for Revamp of 20 unmanned well platforms in north and south field of Mumbai High to “as new” condition

Client - Oil & Natural Gas Corporation, India

Engineering Schedule – 12 Months